MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Andes

Andes

PROJECT HIGHLIGHTS

Commissioned January, 2013 Domestic WW, Retrofit Permit(s); Discharge NA/0.5/0.5 (TN/TP/Turbidity) POTW ⇒ Stream MMF Capacity: 0.062 MGD $24.19/gal 1 FTE (Full-Time Employees)
New MBR retrofit in SBR basins leaves more volume available for EQ and WAS and achieves water quality requirements for NYC Watershed.

DESCRIPTION

Andes is another Ovivo MBR installation in NYC watershed. It is a SBR retrofit which makes the operations at the facility much simpler. The original flow schematic included a SBR followed by sand filters and microfiltration. The SBR and microfiltration membranes were falling apart and they needed an upgrade that could meet the stringent water quality requirements for watershed discharge. Ovivo MBR system replaced SBR, Sand filters and microfiltration membranes. There are two SBR trains, one train is converted to EQ, anoxic and MBR basin and the other SBR train is converted to a Calamity tank and Sludge holding tank. Plant

LOCATION

Andes, NY, NY

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MBR
Previous Facility Type SBR
Owner Town of Andes
Engineer Cedarwood Engineering
Contractor Cedarwood Engineering
Operations Cedarwood Operations
Delivery Method DBB
Time To Retrofit 8 months
Total Installed Project Cost $1,500,000

PLANT DESIGN INFORMATION

Fine Screen Type Bar Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology Aspirating Mixer
MBR Blower Type Positive Displacement
Solids Management Data Hauling
SCADA System Wonderware
Disinfection Method UV
# Process Stages 2

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 1
Submerged Membrane Unit (SMU) RW400, KUBOTA®
# SMU 2
Design Flux (MMF) 4.97 gfd
Minimum Temperature 8°C
Peak Factor 1.5
# of Maintenance Cleans 6