MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Belfair

Belfair

PROJECT HIGHLIGHTS

Commissioned April, 2012 Domestic WW, Total Greenfield Permit(s); Reuse 8/NA/2   (TN/TP/Turbidity) Municipal ⇒ Industrial Reuse,Irrigation MMF Capacity: 0.5 MGD $21.8/gal 2 FTE (Full‐Time Employees)  
The project will build a safe, efficient and environmentally friendly sewer system for the Belfair Urban Growth Area (UGA) and is seen as a pivotal element   vital to the health of Hood Canal.

DESCRIPTION

The Belfair WWTP is a new MBR plant designed to help protect Hood Canal and treat wastewater to achieve water quality results equivalent to Class A reuse, as well as support the backbone for urban infrastructure and growth in Belfair on a long‐term basis. The first phase of the project has a treatment daily average capacity of 0.5 MGD and a second phase will increase this capacity to 1.4 MGD with a peak of 2.8 MGD.

LOCATION

Belfair, WA

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MBR
Previous Facility Type None
Owner Mason County
Engineer CH2MHill
Contractor BOSS Construction
Operations Negotiation
Delivery Method 24 months
Time To Retrofit $10,900,000
Total Installed Project Cost $

PLANT DESIGN INFORMATION

Fine Screen Type Drum Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology Fine Bubble, Disks
MBR Blower Type Turbo
Solids Management Data Hauling
SCADA System Wonderware
Disinfection Method UV
# Process Stages 4

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode PAG (Pump Assited Gravity)
# of Reactors : 4
Submerged Membrane Unit (SMU) RW400, KUBOTA®
# SMU 12
Design Flux (MMF) 7.75 GFD
Minimum Temperature 10°C
Peak Factor 2.6
# of Maintenance Cleans 4
Bayfront
Big Oaks