MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Cultas Country

Cultas Country

PROJECT HIGHLIGHTS

Commissioned May, 2009 Domestic WW, Greenfield Permit(s); Discharge 15/NA/NA   (TN/TP/Turbidity) Resort ⇒ Leach Field MMF Capacity: 0.08 MGD 0.25 FTE (Full‐Time Employees)
Corix said, "Membranes are in vogue and their dependability is proven, enabling us to make a decision to go with membranes."

DESCRIPTION

The Cultus Country Resort in British Columbia is 60 miles east of Vancouver. Corix and Ovivo joined hands to provide Ovivo’s first fully Enviroquip MBR system for a wastewater treatment plant in Canada. The selected wastewater treatment system design for the resort would have to be flexible enough to handle a range of hydraulic demands. Using the concept of biohydraulics, the Cultus Country MBR system was designed to exceed biological treatment objectives over the range of expected operating conditions. The MBR system is designed with the Storm Master™ configuration, which can significantly reduce solids handling costs by thickening solids up to 3%. This capability minimizes hauling requirements and will thus save the plant thousands of dollars in hauling expenses.

LOCATION

Lindell Beach, BC

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MBR, Storm Master
Previous Facility Type None
Owner Corix
Engineer Corix
Contractor Corix
Operations Corix
Delivery Method DBO
Time To Retrofit 12 months
Total Installed Project Cost $Confidential

PLANT DESIGN INFORMATION

Fine Screen Type Bar Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology None Required
MBR Blower Type Positive Displacement
Solids Management Data Membrane Thickening
SCADA System Wonderware
Disinfection Method UV
# Process Stages 2

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 2
Submerged Membrane Unit (SMU) ES200, KUBOTA®
# SMU 4
Design Flux (MMF) 7.7 gfd
Minimum Temperature 12°C
Peak Factor 2.0
# of Maintenance Cleans 4