MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Deltona

Deltona

PROJECT HIGHLIGHTS

Estimated Completion January, 2016 Domestic WW, Greenfield Permit(s); Discharge 3/1/NA   (TN/TP/Turbidity) Municipal -> Discharge MMF Capacity: 1.73 MGD $14/gal 

DESCRIPTION

The Deltona WRF is currently under construction. The reclamation facility is designed to support and service sewer flows for growth along the SR 415 corridor and development on Deltona’s east side, and provide additional treatment capacity to the City. In 2007, Baskerville‐Donovan completed the evaluation of hollow fiber membrane technology versus flat plate membrane technology. Based on a robust design, process flexibility, and operational simplicity, Ovivo’s membrane technology won the pre‐selection process in 2009. The Deltona WRF consist of a five‐stage treatment process for the removal of nutrients and organic pollutants, and it is designed to meet the Florida Department of Environmental Protection (FDEP) mandated Advanced Wastewater Treatment (AWT) nutrient removal requirements consisting of TN<3 mg/L and TP<1 mg/L.

LOCATION

Deltona, FL

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Ovivo® MBR
Previous Facility Type N/A
Owner City of Deltona, FL
Engineer Baskerville-Donovan, Inc.
Contractor WPC Industrial Contractors, LLC
Operations City of Deltona
Delivery Method Pre-Selection
Time To Retrofit 24 months
Total Installed Project Cost $24,241,665

PLANT DESIGN INFORMATION

Fine Screen Type Band Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology Fine Bubble
MBR Blower Type Rotary Lobe
Solids Management Data Chemical Neutralization System
SCADA System Wonderware
Disinfection Method Chlorine
# Process Stages 5

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Suction
# of Reactors : 4 (3 reactors outfitted with SMUs, 1 future)
Submerged Membrane Unit (SMU) RWR00 KUBOTA®
# SMU 18 installed, 6 future
Design Flux (MMF) 15.36 gfd
Minimum Temperature 20°C
Peak Factor 2.0
# of Maintenance Cleans 2
Delphos
DMV International