MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Eagle Crest

Eagle Crest

PROJECT HIGHLIGHTS

Commissioned May, 2003 Domestic WW, Greenfield Permit(s); Reuse NA/NA/NA   (TN/TP/Turbidity) Resort ⇒ Reuse MMF Capacity: 0.075 MGD $22.67/gal 0.5 FTE (Full‐Time Employees) 
The plant operates virtually unattended with the exception of solids handling and biannual membrane cleaning.

DESCRIPTION

Eagle Crest Resorts, a full service destination resort located on 1,700 acres in the high desert of Central Oregon, constructed a wastewater treatment plant with ENVIROQUIP® MBR Technology to service the resort. Ovivo MBR system was selected for this application based upon its small footprint, low maintenance, simple operation and superior effluent quality. The treatment plant gets wastewater from a 100‐room inn, town homes, a restaurant and various recreational facilities at the resort. Effluent from the plant is utilized for irrigation of the four golf courses at the site, reducing the demand on the local aquifer. The plant is completely enclosed within a building to minimize the visibility of the plant the potential for noise and/or odors.

LOCATION

Redmond, OR

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MBR
Previous Facility Type None
Owner Eagle Crest Resort
Engineer Vision Engineering
Contractor Eagle Crest, Inc
Operations Cline Butte Environmental
Delivery Method DB
Time To Retrofit 12 months
Total Installed Project Cost $1,700,000

PLANT DESIGN INFORMATION

Fine Screen Type None
Aperture or Slot Size NA
Supplemental Aeration Technology Fine Bubble, Tubes
MBR Blower Type Centrifugal
Solids Management Data Hauling
SCADA System Wonderware
Disinfection Method UV
# Process Stages 2

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 2
Submerged Membrane Unit (SMU) ES75, KUBOTA®
# SMU 9
Design Flux (MMF) 12.9 gfd
Minimum Temperature 15°C
Peak Factor 2.0
# of Maintenance Cleans 3
Dundee, OR
Earth Rangers