MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Island Resort

Island Resort

PROJECT HIGHLIGHTS

  • Commissioned June, 2014
  • Commercial WW
  • TN 30, TP 10
  • Day Resort => Reuse
  • MMF Capacity: 0.015 MGD
  • 1.0 FTE (Full-Time Employees)
  • Quick Delivery
  • Reduced Risk
Utilizing Ovivo reduced the corporations risk exposure

DESCRIPTION

Wastewater from a temporary destination location can be a challenge to effectively treat, due to transit visitors which can swell the resort population from a few to a few thousand. The existing SBR could not be managed so that it produced the effluent quality required for the resort. The resorts corporation looked for another solution and upon evaluation of different technologies and suppliers settled on Ovivo and our microBLOX™ Package Plant.

One of the main evaluated points that pointed to Ovivo’s selection was our excellent customer support and the smart systems which are included with every microBLOX™.

LOCATION

,

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Ovivo 28’ microBLOX™ MBR
Previous Facility Type SBR
Owner Un-named Corporation
Engineer TSG
Contractor TSG
Operations Corporation Employee
Delivery Method Pre-purchase
Time To Retrofit 6 months
Total Installed Project Cost $1,000,000

PLANT DESIGN INFORMATION

Fine Screen Type Bar Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology Concentrated Oxygen
MBR Blower Type Regenerative
Solids Management Data Hauling
SCADA System Red Lion
Disinfection Method None required
# Process Stages 1 or 2 Stage Hybrid

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 2
Submerged Membrane Unit (SMU) ES200
# SMU 2
Design Flux (MMF) 4.4 gfd
Minimum Temperature 30°C
Peak Factor 3
# of Maintenance Cleans 4
Hampton Creek
Jackson Hole Airport