PROJECT HIGHLIGHTS
Commissioned June, 2011
Commercial WW, Greenfield
Permit(s); Not Required
10/4/1 (TN/TP/Turbidity)
Resort, Municipal, Commercial Buildings ⇒ Irrigation
MMF Capacity: 0.62 MGD
4 FTE (Full‐Time Employees)

Ovivo replaces hollow‐fiber for the phase 2 expansion of this MBR reuse facility.
DESCRIPTION
Rose Hall's water reclamation facility, designed to treat wastewater collected from this fast‐growing coastal area, illustrates the developers' commitment to preserve the environment and natural resources at Rose Hall. The facility serves Rose Hall's hotels and tourist facilities and provides treated wastewater for the resort's golf courses. In addition to fairways, recycled water is used for lakes, lagoons and landscaping. The heart of the Rose Hall facility is the Membrane Bioreactor process, which ensures the treated water meets the government's environmental requirements and is safe for use in public places. Ten kilometers of pipeline assure that all hotels and facilities can access this advanced hydro system.
LOCATION
Rose Hall, NA
IMAGES

PROJECT OVERVIEW
System Type(s) | Enviroquip ® MBR |
---|---|
Previous Facility Type | MBR |
Owner | Rose Hall Utilities |
Engineer | Fulghum, MacIndoe & Assoc |
Contractor | Unknown |
Operations | Rose Hall Utilities |
Delivery Method | Pre-Selection |
Time To Retrofit | 8 months |
Total Installed Project Cost | $Unavailable |
PLANT DESIGN INFORMATION
Fine Screen Type | Drum Screen |
---|---|
Aperture or Slot Size | 2 mm |
Supplemental Aeration Technology | Fine Bubble, Tubes |
MBR Blower Type | Positive Displacement |
Solids Management Data | Unknown |
SCADA System | Wonderware |
Disinfection Method | Chlorine |
# Process Stages | 3 |
MBR (MEMBRANE ZONE) DESIGN
Filtration Mode | Pumped |
---|---|
# of Reactors : | 2 |
Submerged Membrane Unit (SMU) | RW400, KUBOTA® |
# SMU | 8 |
Design Flux (MMF) | 12.4 gfd |
Minimum Temperature | 15°C |
Peak Factor | 2.0 |