MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

SanofiPasteur

SanofiPasteur

PROJECT HIGHLIGHTS

Commissioned July, 2008 Industrial WW, Greenfield Permit(s); Reuse 7/1/NA    (TN/TP/Turbidity) Pharmaceutical ⇒ River MMF Capacity: 0.84 MGD $9.52/gal 2 FTE (Full‐Time Employees)  
2009 Governor’s Awards for Environmental Excellence.

DESCRIPTION

Sanofi Pasteur Inc.’s vaccine production facility needed to expand its on‐site wastewater treatment plant (WWTP) to manage increased wastewater from planned growth in administrative, research and development, and manufacturing activities.    The expansion required almost tripling the treatment capacity to 950,000 gallons per day.  Ovivo’s MBR advanced treatment technology was selected and commissioned on a fast track schedule with more than half    of the increased wastewater flow being used for seasonal landscape and spray irrigation

LOCATION

Swiftwater, PA

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MBR
Previous Facility Type CAS
Owner Sanofi Pasteur
Engineer Weston Solutions
Contractor Skanska
Operations Sanofi Pasteur
Delivery Method DBB
Time To Retrofit 12 months
Total Installed Project Cost $8,000,000

PLANT DESIGN INFORMATION

Fine Screen Type Drum Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology Fine Bubble, Tubes
MBR Blower Type Positive Displacement
Solids Management Data Hauling
SCADA System iFix
Disinfection Method UV
# Process Stages 3

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 4
Submerged Membrane Unit (SMU) EW400, KUBOTA®
# SMU 12
Design Flux (MMF) 14.7 gfd
Minimum Temperature 15°C
Peak Factor 2.0
# of Maintenance Cleans 4