PROJECT HIGHLIGHTS
Commissioned October, 2007
Domestic WW, Greenfield
Permit(s); Discharge
8/NA/0.09 (TN/TP/Turbidity)
Housing Development ⇒ Groundwater Recharge
MMF Capacity: 0.13 MGD
$24.2/gal
1 FTE (Full‐Time Employees)

Stony Point was the first high capacity MPAC plant.
DESCRIPTION
In order to reduce engineering and construction time, a 125,000 gpd MPAC modular MBR with concrete tanks was selected. It contains a three process design with anoxic, aeration, and membrane zones. Beyond the small footprint and consistently good effluent quality, the MBR was selected for its ease of operation and limited operator input, as it is located in a remote location.
LOCATION
Del Valle, TX
IMAGES

PROJECT OVERVIEW
System Type(s) | Enviroquip ® MPAC® |
---|---|
Previous Facility Type | None |
Owner | Aqua Water Supply Corporation |
Engineer | Aqua Engineering |
Contractor | Cunningham Construction |
Operations | Aqua Water Supply Corporation |
Delivery Method | Negotiation |
Time To Retrofit | 8 months |
Total Installed Project Cost | $3,025,600 |
PLANT DESIGN INFORMATION
Fine Screen Type | Bar Screen |
---|---|
Aperture or Slot Size | 2 mm |
Supplemental Aeration Technology | Fine Bubble, Disks |
MBR Blower Type | Positive Displacement |
Solids Management Data | Hauling |
SCADA System | Wonderware |
Disinfection Method | Chlorine |
# Process Stages | 3 |
MBR (MEMBRANE ZONE) DESIGN
Filtration Mode | Pumped |
---|---|
# of Reactors : | 2 |
Submerged Membrane Unit (SMU) | ES100, KUBOTA® |
# SMU | 12 |
Design Flux (MMF) | 11.8 gfd |
Minimum Temperature | 17°C |
Peak Factor | 2.0 |
# of Maintenance Cleans | 2 |