MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Stoutsville

Stoutsville

PROJECT HIGHLIGHTS

Commissioned June, 2007 Domestic WW, Greenfield Permit(s); Discharge 10/NA/0.09    (TN/TP/Turbidity) Municipal ⇒ Groundwater Recharge MMF Capacity: 0.13 MGD $9.42/gal 1 FTE (Full‐Time Employees)
This upgrade resulted in energy bills dropping by 45%.

DESCRIPTION

This plant was originally selected to replace an aging conventional activated sludge facility in central Ohio.    In order to reduce engineering and construction time, a 125,000 gpd MPAC modular MBR with concrete tanks was selected.  Beyond the small footprint and consistently good effluent quality, the MBR was selected for its ease of operation and limited operator input.  Because the plant has typically seen less than half of its design flow, it was upgraded in 2011 to an Energy Pro configuration, which allows one or both MBRs to operate as required to handle a given influent flow.   This upgrade resulted in energy bills dropping by 45%.

LOCATION

Stoutsville, OH

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MBR, MBT
Previous Facility Type CAS
Owner Earnhart Hill Regional Water Sewer District
Engineer R.D. Zande
Contractor Downing Construction
Operations Earnhart Hill Regional Water Sewer District
Delivery Method Pre-Selection
Time To Retrofit 12 months
Total Installed Project Cost $1,225,000

PLANT DESIGN INFORMATION

Fine Screen Type Bar Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology Medium Bubble, TransMax
MBR Blower Type Positive Displacement
Solids Management Data Membrane Thickening
SCADA System RSView32
Disinfection Method UV
# Process Stages 3

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 2
Submerged Membrane Unit (SMU) Es125, KUBOTA®
# SMU 10
Design Flux (MMF) 11.6 gfd
Minimum Temperature 10°C
Peak Factor 2.0
# of Maintenance Cleans 2