MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
Search
  • HOME
  • CASE STUDIES
    • Featured Case Studies
  • SOLUTIONS
    • Ovivo®MBR
    • microBLOX®
    • EQuiptech™
    • stormBLOX™
  • DOWNLOADS
    • QUICK CARDS
    • VIDEOS
    • RESOURCE CENTER
  • ABOUT US
  • SUPPORT
  • CONTACT
  • LOGIN
  • CLIENT’S ZONE
    • LOGOUT
  • Sign In
  • CLIENT’S ZONE
    • LOGIN
    • LOGOUT
MBRCentral.com is your source of information for OVIVO® MBR products & services. Constantly evolving, MBRCentral.com will provide you with all the tools you need regarding OVIVO® MBR.
  • HOME
  • CASE STUDIES
  • SOLUTIONS
    • Ovivo® MBR
    • microBLOX®
    • equipTECH®
    • stormBLOX™
  • DOWNLOADS
    • Quick Cards
    • Videos
    • Resource Center
  • ABOUT US
  • SUPPORT
  • CONTACT
Menu

Return to previous page
Home Case Study

Waccabuc

Waccabuc

PROJECT HIGHLIGHTS

Project Highlights Commissioned November, 2008 Domestic WW, Greenfield Permit(s); Discharge NA/1.5/2   (TN/TP/Turbidity) Resort ⇒ Lake, Pond, Irrigation MMF Capacity: 0.01 MGD $356.0/gal 0.25 FTE (Full‐Time Employees)

DESCRIPTION

During construction of the Waccabuc County Club WWTP, NY DEP evaluated the capability of MBRs to meet the agency’s tertiary treatment requirement. The findings were that MBR did meet the requirement led DEP to decide to eliminate the need for an additional tertiary treatment step. The decision resulted in a savings of $800,000 in capital costs. This was the first MBR plant in the New York City watershed to comply with the tertiary filtration requirement without additional microfiltration. It set a precedent for other plant designs to follow. DEP also is now looking at retrofitting facilities with MBRs to replace failing or aging secondary treatment systems in order to increase capacity, achieve higher effluent quality, and reduce operating costs.

LOCATION

Waccabuc, NY

IMAGES

GENERATE PDF VERSION

PROJECT OVERVIEW

System Type(s) Enviroquip ® MPAC®
Previous Facility Type Septic
Owner Waccabuc Country Club
Engineer Malcolm Pirnie
Contractor Kovacs Construction Corporation
Operations Applied Pollution Control
Delivery Method Negotiation
Time To Retrofit 18 months
Total Installed Project Cost $3,560,000

PLANT DESIGN INFORMATION

Fine Screen Type Bar Screen
Aperture or Slot Size 2 mm
Supplemental Aeration Technology None Required
MBR Blower Type Regenerative
Solids Management Data Hauling
SCADA System Wonderware
Disinfection Method UV
# Process Stages 2

MBR (MEMBRANE ZONE) DESIGN

Filtration Mode Pumped
# of Reactors : 1
Submerged Membrane Unit (SMU) Es150, KUBOTA®
# SMU 2
Design Flux (MMF) 4.0 gfd
Minimum Temperature 10°C
Peak Factor 2.0
# of Maintenance Cleans 4